It wasn't even raining real hard and the water was
already overflowing from the upper gutters. Something
wasn't right. The heavy bands haven't arrived yet, just
a couple of shots off the bow. A lull in the downpour
presented an opportunity to squeeze out my daughter's
bedroom window and survey the problem. A clog in the
upper downspout was causing the overflow and explained
the trickle of water running into the lower gutter. Might
as well clean out the lower one while I was there. 6:00
and we're as ready as we're gonna be. Everything is
already up from the basement floor, except the furnace
and water heater. The new bilge pump will be working
overtime for sure. Cocktail hour has officially begun.